Brand Name : JIANBANG
Certification : ISO9001
Place of Origin : CHINA
MOQ : 500KG
Price : Negotiable
Payment Terms : L/C, T/T
Supply Ability : 100000tons
Delivery Time : 3-7days
Packaging Details : metal bucket
Color : Bright red, white
Density : ~1.3 Kg/L
Solid Volume : (50±2) %
Film Thickness : 50µm dry film thickness (about 100µm wet film thickness)
Theoretical Spreading Rate : 7.69m²/Kg (50µm dry film thickness)
Full Cure : (23±2℃) 24h
Flash Point : 25℃
Pot Life : a year
Reflective Road Marking Paint Acrylic Aerial Sign Paint Protection Of Cement Chimneys And Steel Structure Tower
This product is composed of acrylic resin, plasticizer, sun-resistant pigment and organic solvents. Meanwhile, the paint film is clear, bright, highly visible and has excellent weather resistance.
Typical Uses:
This paint is designed for the sign and protection of cement chimneys and steel structure tower.
Application Guide:
Mixing:
rReady to use.
● Thinner:
Acrylic thinner
● Airless Spray:
Nozzle tip: 0.017~0.023 inch.
Spray pressure: 15~18 MPa.
Thinner ratio: 0~15% (by weight of paint).
● Brush, Roller:
Recommended.
Must achieve required thickness.
Drying Schedule
Substrate temperature | 10 °C | 20 °C | 30 °C |
To touch (50um) | 2h | 1h | 30min |
To handle (50um) | 8h | 4h | 3h |
Min. recoating time | 8h | 4h | 3h |
Max. recoating time | - | - | - |
* Make sure no chalking and other contaminations before recoating. | |||
* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition, humidity, mechanical strength,etc. |
Surface Treatment
A: For the concrete base floor, first ensure reliable
moisture-proof facilities are set below the base concrete. New
concrete or the cement base shall be cured for at least 28 days
with moisture content not exceeding 5%. The moisture content shall
be evaluated empirically.
B: The surface of the base shall be clean, firm and free from
contaminants such as mortar paint splashes, curing agent, grease,
etc. It’s better to roughly polish the excessive floating pulp and
grind the oily ground with electric angle grinder.
C: Defects such as cracks and drums shall be repaired first.
D: The surface shall be clean, firm and dry whatever methods are
used to treat it. Above all, the surface shall not be in the state
of rising moisture.
E: The base layer shall be cleaned and burnished with a grinder.
Application
Substrate temperature shall be at 3 ℃ higher than dew point, relative humidity less than 85%. Measurement of temperature and humidity should be close to substrate.
Safety and Healthy
Please refer to MSDS before using this product. If you do not fully understand the restrictions, or cannot follow MSDS directions strictly, do not use this product. The coating is a water-based coating. Water-based solvent has mild eye irritation, upper respiratory tract irritation, long-term close contact with dry skin, etc. Proper ventilation and precautionary measures must be in place. PPE is necessary to avoid this product contacting with eyes or skin. More detailed safety tips are based on practical situation.
Please handle used paint barrel correctly to avoid any pollution.
Storage:
Store this product in shady, dry, and ventilated warehouse. The shelf life is 12 months at room temperature. If exceeding shelf life, the products shall be tested before using.
Disclaimer:
All technical data given in this document is based on our knowledge achieved in lab and practice, it is not completely correct. Although we try to keep the validity of our advice, however we cannot predict the practical conditions that will affect paint quality. Herein, we cannot be responsible for the consequences of variations in such conditions, or for unforeseen conditions. We reserve the right to modify this document without informing in advance.
![]() |
reflective road marking paint Acrylic Aerial Sign Paint Protection Of Cement Chimneys And Steel Structure Tower Images |